2023年成长记录册 英文 成长记录英语样例(精彩5篇)
【导读预览】此篇优秀范文“2023年成长记录册 英文 成长记录英语样例(精彩5篇)”由阿拉题库网友为您整理分享,以供您参考学习之用,希望此篇资料对您有所帮助,喜欢就复制下载支持吧!
成长记录册 英文 成长记录英语【第一篇】
1. cost-effective: more design working experience, has been a registered architect certificate
2. high efficiency: hard-working, able to stay up late to work overtime, work quality and efficiency of first place
3. good overall performance: good health, not destroy burn the midnight oil, there is a strong will and physique; good theoretical foundation, architecture majors in college, a solid foundation; good practical experience in design institute to do the work of many years of theory with practice; it covered a wide range, in addition to construction and planning, real estate and national economic laws equally well known.
4. good karma: unity colleagues, contact classmates, studied at teacher, make friends, team spirit, strong collective sense of honor.
5. good communication skills: listen to the rational, emotional expression; steady character, cheerful, optimistic.
6. good organization and coordination capacity: as a project hosted, responsible for communication with the party, and the design team management, coordination architecture, structure, water, heating, electricity various professionals work together to complete the whole project.
1. 性价比高:多设计院工作经验,已获得一级注册建筑师证
2. 效率高:吃苦耐劳,能熬夜加班,工作效率质量放第一
3. 综合性能好:身体好,熬夜加班摧不垮,有坚强的意志和体魄;理论基础好,建筑学科班出身,基础坚实;实践经验好,在设计院做了多年理论联系实践的工作;涉猎广泛,除了建筑和规划,对房地产业和国家经济规律同样熟知。
4. 人缘好:团结同事,联系同学,求学于名师,广交朋友,有团队精神,集体荣誉感强。
5. 沟通能力好:理性听取,感性表达;性格稳重开朗,乐观向上。
6. 组织协调能力好:担任工程主持,负责与甲方沟通,并管理设计团队,协调建筑、结构、水、暖、电各专业人员协同工作,完成完整项目。
成长记录册 英文 成长记录英语【第二篇】
you work carefully, writing neat. study hard, results have improved. but the whole point of view, the subjects are not very prominent. i hope you find their own reasons, pay attention to actively use their brains, active thinking, and constantly improve their learning methods, improve learning efficiency, strive for greater progress. as long as you can make unremitting efforts to study, your grades will improve, i will be confidently waiting for the day.
you lively and cheerful personality, respect for teachers, unite students, courteous, to humbly accept the teacher's teaching, and consciously abide by the school rules school discipline. actively participate in various activities, from all aspects of continuous enrichment, improve themselves, for the future to lay a solid foundation. the results on the rise, if the study can be hard on a bit, there are difficulties in the determination, will be able to score on the new breakthrough.
you are one of the larger students in the class, the basic class can be active and active brain, active speaking, ability to accept and respond faster, but the recitation task vacancies, which will make your basic skills is not hard enough. i hope in the future to learn more hard and practical, to explore scientific learning methods, to determine a competitor, catch up, as long as you have the determination, the teacher believes you will be better.
you are considerate, enthusiastic to help people in difficulties, you are very diligent, learning is always meticulous, seriously, but your academic performance is not outstanding. as the saying goes that the world is not difficult, i'm afraid people, i believe, as long as you adhere to the learning attitude, change the learning methods, academic performance will certainly be substantial progress! believe it?
you are a good teacher, unity and good students. can consciously abide by the rules and regulations of the school, and consciously resist all kinds of bad can concentrate on listening, do a good job of notes, after school hours to complete homework. study hard, results have improved. on duty work seriously responsible. i hope that in the future can maintain the achievements have been made, continue to strive for better.
you respect teachers, unite students, the class responsible for the work. but after school discipline relaxation, academic performance has recently declined, i believe that as long as you get rid of bad habits, and constantly improve the learning method, the scientific allocation of learning time, subjects can be balanced development. you have to remember that "shushan there is a road for the trail, learn the sea without boundaries bitter boat."
you are motivated, is an obedient sensible, considerate, honest and simple good students. work, you actively work hard, not afraid of suffering, not afraid of ng hard, positive thinking, do not understand the experience to the teacher to ask, to complete the work. i hope you can strengthen confidence, perseverance, courage and courage, and constantly improve the learning method, for a breakthrough in academic performance.
成长记录册 英文 成长记录英语【第三篇】
in the past work * months, there is joy, success, frustration and failure in the leadership and care and guidance, with the support of colleagues in the full support of my ability to work has been greatly improved, now * monthly self-evaluation of my work is as follows:
i have been working in the company since the help of my colleagues in the care, through personal efforts and work-related experience of the accumulation of knowledge continues to widen, the ability to work and work has made great progress.
at work, conscientiously study business knowledge, continue to accumulate experience, and actively participate in learning and training, and constantly enrich themselves; 2, compliance. 3 months, their work is not afraid of hardship, not afraid of tired, learning excellent staff approach, earnestly completed the work of the job tasks; 3, unite colleagues and work together. 4, due to their lack of work experience in the work of the lack of practical experience in dealing with customer complaints, service work done enough meticulous, this is my future direction of the effort.
i am sincere, optimistic and cheerful, rich fighting spirit, hard-working. have a strong sense of responsibility and team spirit, have a strong ability to learn and adapt to the new environment, strong desire for knowledge, strong-hearted, willing to help others, love communication, interpersonal relationships it is good.
in the ordinary workplace, establish a "customer first, the intention of service" concept is my company for each employee of the most basic requirements. i deeply understand that the dry line will love his party, love line will be special line, special line to make first-class work performance. first-class service work requires us to strengthen the service concept, enhance service awareness at the same time, we must from love and dedication, honesty and trustworthiness, willing to start.
i strive to work in the future i would like to grow into a good staff, strive for the company to bring greater benefits.
成长记录册 英文 成长记录英语【第四篇】
blink of an eye 10 years have gone, we ushered in a new year. summing up the work of the past year, from a personal point of view about the measurement of awareness.
quality is the life, quality is the fundamental guarantee for enterprise development. in the fierce competition in the construction market today, how to improve the construction quality management level is every enterprise managers must think about. factors affecting the quality of construction in all aspects. from the engineering measurement point of view, analyze the work of measuring the pay-off to ensure and improve the quality of the construction of an important role, and simply how to strengthen the management of measurement work to improve the quality of construction.
it is a very important technical work of municipal road engineering that the measuring and measuring line is an important technical work. it is inseparable from the whole process of construction, from the preparation before construction to the completion of the construction, to the final acceptance after construction. how to do a quick and good measurement of the line, is a basic technical skills and test the basic requirements.
do the measurement before the commencement of the end
before the start of the project, the survey and design units shall be responsible for on-site surveying and settlement according to the design documents, and the site standard point, conductor piles and crossing point piles shall be clearly identified according to the design drawings. within the measurement of signs, must take appropriate protection measures. on the measurement of the end, it is necessary to emphasize the protection of pile position, that is, in the design unit after pile, should be timely use of brick piers or pouring cement pier and other methods to be protected, so as not to lose. these piles are generally farmland or residential areas, it is easy to be man-made destruction, and once destroyed, let the survey and design units to fill test, then delay the construction, but also increase the cost.
midline retest and edge loft
center line measurement is based on the alignment measurement, the road center line plane position on the ground marked in detail. it is the difference with the alignment measurement is: alignment measurement, but the intersection of the road and the straight line segment of the necessary turning point marked out, and in the midline measurement, according to the intersection and the turning point with a series of stakes will road straight segment and curve segments are specified in detail on the ground.
the alignment survey is usually carried out by the survey and design units, and then the pile and measurement results to the construction side, the construction unit by the middle line and construction measurement.
subgrade construction should be fully restored before the center line, according to the restoration of the pile in the road and the relevant provisions of the roadbed side of the pile. on the midline re-measurement and edge lofting, should pay attention to the following points;
one should pay attention to the distance between the intersection, the direction is consistent with the drawings; such as an engineering project has several tenders, should pay attention to the center of the adjacent tenders are closed, midline measurements should be in-depth adjacent tenders 50 ~ 100 m; attention should be paid to the center of the structure such as bridge and culvert is closed; should pay attention to the relative position of the building and other buildings and drawings are consistent. if you find problems in a timely manner to identify the reasons for the design unit.
second, retaining pile set. it is very important to set up pile protection pile in the middle of the road, but these piles are easy to be destroyed during the construction. therefore, it is necessary to carry out the restoration and surveying work of the middle pile during the construction of the roadbed. in order to quickly and accurately restore the center pile in the original position, must be on the road before the construction of the main control point of the pile such as the intersection point, turning point, curve control points set up retaining pile. the so-called retaining pile, is outside the scope of the construction is not easy to be destroyed where some stakes set ing to these pile, with simple methods (such as the intersection point, range, etc.), you can quickly restore the original pile point.
set the pile should pay attention to the following aspects: in each straight section of the road, at least three control piles to set up retaining pile, so even if there is a control pile can not be restored, the other two points can be used to restore the straight section to the original position; the intersection angle of the two direction lines as close as possible to 90 °, should not be less than 30 ° angle of intersection; retaining pile should be selected outside the scope of construction, but not too far away; pile distance can not be too far; the retaining pile must be solid and reliable, pile to facilitate the erection of measuring instruments and observation.
set up retaining pile of curve side. for the curve segment, because of the more difficult to determine the side of the pile, re-measuring time-consuming more, so after a precise line, the edge of the curve section of the pile pile should also be set representative pile, which can reduce repeat the measurement, reducing the measurement workload.
third, the laying of mileage pile. after the midline pile is fixed, it is possible to lay out the control pile of the mileage pile on this basis. mileage pile layout principle is: in the straight section, generally arranged in every 100 meters of the entire pile of cross-section, similar to the common road construction 100 meters pile layout; in the curve section of the pile to be properly encrypted, in the curve mileage pile can be large stakes, above the mileage mark with paint or ink station, into the road outside the scope of construction on both sides of the ground, it is best to play on each side of a . to ensure that the construction is not easy to damage the case, from the embankment edge should be as close as possible to facilitate the use, generally 1 to 2 meters.
the laying of mileage piles is not addressed in most of the surveying and setting-out sections of the construction manual, and is not taken into account at many sites. i found in some sites, some construction technicians in the construction survey, the determination of the distance station is a long distance from a foot a foot row over, not only a waste of time and prone to cumulative error. if the mileage stakes are not allowed, then the elevation, slope quality control is out of the question.
third, the proofreading and additional standard point
first, the use of design units set up before the standard point should be carefully checked, close the gap may not exceed the limit, such as exceeding the allowable deviation should identify the reasons and promptly reported to the relevant departments. the design unit delivers the leveling points normally set several months ago. these points in the field can easily be man-made collision or natural subsidence due to the ground changes, so be sure to carefully review before use; second, the standard point of additional principles: the distance is generally 150 to 200 meters, plus transfer station for the principle. the additional standard point should be closed with the design unit to pay the standard point, such as an engineering project at several tenders, but also with the adjacent standard segment of the standard point of closure, the closure may not exceed the limit.
the position of the leveling point shall be located on a solid, non-sinking, non-touching ground or a solid building of a permanent building. can also be installed in the protection of deep-buried wood piles or concrete piles, and make clear signs. the leveling point should be checked once a month, and the level of the spot where the movement is suspected should be checked after re-inspection.
vertical and horizontal cross-section measurement
through the midline re-test, side piles line and the laying of the standard point, you can measure the vertical and horizontal cross-section. the main purpose of vertical and horizontal cross-section measurement is to calculate the amount of earth, so the vertical and horizontal cross-section measurement after the end of the measurement results should be checked with the design drawings. where the results with the original within the allowable deviation, the original results shall prevail, and only when there are significant differences with the original results, can be reported to the supervisory engineer after verification changes. it should be noted that: the work must be carried out before construction. if the measured amount of earth and the design does not conform to the supervision of the approval should also be carried out before site excavation to the supervisor before the actual amount of earthwork and design does not match, require additional visa, but the final supervision be sure to pay attention to the timeliness of the work.
成长记录册 英文 成长记录英语【第五篇】
during this period to seriously comply with the rules and regulations of the new group, love plants such as love home, but also at work
constantly strict demands on themselves, with the ministry of the production process work, the layout of the leadership to complete the various tasks. diligent and enterprising, innovative, and continuously improve their work efficiency and found that the work of the problems in a timely manner to report to the leadership and seek solutions to the company's development and make greater contributions.
first, study with great concentration, conscious temper.
although i took the forklift driving license is not long, just started, the operation is not particularly skilled, but in the course of my study, and consciously temper. after 3 months, i have been able to carry out skilled operation control, posts for three months to basically no mistakes, the ability to work has been greatly improved. for the future to complete the work to lay a solid foundation. i will continue in the next work, to further improve my professional level, at the same time to do a better job.
second, strict requirements, love and respect their jobs.
work in strict demands on themselves, diligent, love and respect their jobs, do not bow before difficulties do not back in front of the work, high-quality completed the work. in future work, i will humbly ask experienced instructors, and constantly sum up experience, to make up for their own deficiencies. at the same time, continue to learn a variety of theoretical knowledge and professional skills for the company's contribution to the development of their own strength!
third, strengthen training, improve operational skills.
in order to do their work well, i make full use of limited time, strengthen the operation skills training, improve the efficiency of loading and unloading operations to ensure the safety of loading and unloading trucks, before the operation must be loaded with the number of pieces of goods, specifications for serious study to determine the code put standard, so as to ensure the volume filled with the vehicle. i remember the beginning of forklift operations, i have flip then, i have to strengthen all aspects of skills training, and achieved good results, summed up a set of forklift driver training methods.